Email Us
281.497.8617
Offering world-class expertise in the fields of Engineering and Project Management, Procurement, Commissioning, Construction Management, Maintenance and more.
» Read More |
|
Major NOC - Angolan TLP Scope of Work
In 2013, William Jacob Management was awarded a contract to provide FEED services on a TLP for an undisclosed major NOC. The platform is part of a surface structure package that also includes a floating production, storage and offloading vessel.
William Jacob Management is part of an Design consortium to design and build a tension-leg wellhead platform that will be delivered to a field off the coast of Angola.
Project Name |
Angola TLP |
Client |
Undisclosed Major NOC |
Fabrication Location |
Hyundai Heavy Industries |
Install Location |
Undisclosed Angolan Block |
Start - Completion |
2013 - In Progress |
Project Description
|
» |
Tender Design bid to supply a 32-slot tension-leg platform (TLP) for offshore Angola project.
|
» |
The field development plan is estimated to include 15 production wells and 15 water injectors, with oil production expected to lie in the range of 140,000 to 160,000 barrels per day and with nearly 200,000 bpd of water injection. |
» |
The TLP, which will be moored in about 1,300 meters (4,265 ft.) of water, is expected to be delivered by mid-2016. First oil is anticipated to be in 2017-2018. |
|
Scope of Work |
» |
William Jacob Management is providing Design and design services for a self contained drilling rig that will be mounted on the field development TLP. |
|
Vice President, Design |
Trevor Smith |
|